The source documented the timeline of Bandwagon Host's phased replacement of AMD EPYC processors and NVMe RAID-10 storage.
Three batches
The first sources listed are Los Angeles DC9 on July 11, 2025; Hong Kong HK3 and HK8 are recorded on September 20, 2025; and New York USNY_6 and USNY_8 are recorded on May 12, 2026.
How to correspond to your own instance
First, match the update batch using the data center code, then confirm the hardware migration status in the management interface of the existing instance. The article distinguishes between the operations required for newly activated instances and those required for existing instances.
| Upgrade time | Computer room name | Computer room code | Notes |
|---|---|---|---|
| July 11, 2025 | Los Angeles DC9 | USCA_9 | As a popular CN2 GIA data center, it was among the first to complete hardware upgrades, significantly improving stability under high loads. |
| September 20, 2025 | Hong Kong, China | HK3 / HK8 | With high-end lines and flagship hardware, NVMe RAID-10 effectively solves the I/O bottleneck and further optimizes its cost-effectiveness. |
| May 12, 2026 | New York | USNY_6 / USNY_8 | The newly upgraded node signifies that the US East Coast line has fully entered the EPYC era. |